We coordinate end-to-end rollouts with a single PM, controlled chain-of-custody, and audit evidence at every step. Your PM owns scope, risk, resourcing, comms, and approvals—from discovery to signed handover.
We stage builds in a governed flow: asset capture, imaging (OS (Operating System)/MDM (Mobile Device Management)/apps), user mapping, desk readiness, cable management, QA (Quality Assurance), and floor-walk support. Evidence packs include manifests, photos, and sign-offs.
Staging & build. We establish a staging zone and start intake
Unboxing: ESD-safe; asset tag + barcode applied; serial record. Imaging (if request): OS /MDM apps loaded; pilot unit validate. Crates & IDs: counts verified; seal IDs scanned to the manifest.
Desk execution. Desks are finished consistently so testing is fast
Fit & place: PC & equipment positioned under-desk. Connect & dress: peripherals connected; dressed with Velcro. Verify: POST (Power-On Self-Test), network link, screen view
Quality & support. The PM tracks run-rate and exceptions
Spot checks: hourly sample desks, Exceptions: logged with owner/ETA; cleared during floor-walk, Environmental: packaging flattened/segregated; WEEE.
Want to find out more?
When the installation is completed the project manager will provide the end-user with the following items either on the day or post-sanity check. Asset Register: Serial, barcode/QR, user/desk ID Evidence: Photo set (before/after by desk), sign-offs, exceptions log. Summary Metrics: planned vs completed, time to close exceptions.